Reference case Jos van der Lubbe

With this purchase Lasbedrijf Wero has invested in a clean and safe work environment for the welders.
案例简介 下载PDF
解决方案
部门 钢结构
国家 荷兰

The Challenge

After moving into their new building in Nieuwendijk, the Netherlands in 2009, Lasbedrijf Wero started looking for an efficient welding fume extraction system.

The welding works take place both inside specifically designed welding cabins and outside these cabins in the public hall. Lasbedrijf Wero insisted on several, very acceptable, requirements for the new extraction system: it had to be low-maintenance, easy to operate and with a good quality-to-cost ratio.